翻訳と辞書 |
Electricity sector in Venezuela : ウィキペディア英語版 | Electricity sector in Venezuela The electricity sector in Venezuela is one of the few in the world to rely primarily on hydroelectricity, which accounted for 71% in 2004.〔 ==Electricity production== A gross theoretical capability of hydropower is 320 TWh per annum, of which 130 TWh per annum is considered as economically feasible.〔 In 2004, Venezuela produced 70 TWh of hydropower, which accounts 2.5% of world's total. At the end of 2002, total installed hydroelectric generating capacity accounted 13.76 GW with additional 4.5 GW under construction and 7.4 GW of planned capacity. Hydroelectricity production is concentrated on the Caroní River in Guayana Region. Today it has 4 different dams. The largest hydroplant is the Guri dam with 10,200 MW of installed capacity, which makes it the third-largest hydroelectric plant in the world. Other hydroelectric projects on the Caroní are Caruachi Dam, Macagua I, Macagua II and Macagua III, with a total of 15.910 MW of installed capacity in 2003. A new dams, Tocoma (2 160 MW) and Tayucay (2 450 MW), are currently under construction between Guri and Caruachi. With a projected installed capacity for the whole Hydroelectric Complex (upstream Caroni River and downstream Caroni River), between 17.250 and 20.000 MW in 2010.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Electricity sector in Venezuela」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|